locator
notes
Power is spread evenly so machines slow proportionally (300 kW load on 180 kW solar runs at 60%); producer priority solar, then steam/turbine/fusion, then accumulators; idle drain per machine.
Power is spread evenly so machines slow proportionally (300 kW load on 180 kW solar runs at 60%); producer priority solar, then steam/turbine/fusion, then accumulators; idle drain per machine.